1. Counts
Each class records supplied traffic and its period.
Loading...
COREROAD
This tool calculates preliminary traffic indicators from entered data and identifies the information required for a complete pavement study.
Versioned preliminary study
Every rate and factor used is visible. No road factor is added automatically.
The engine separates cumulative traffic, supplied factors and unavailable results.
Each class records supplied traffic and its period.
Growth, direction and lane remain visible.
A factor is used only with its source.
The report prepares professional method selection.
growthSeriesFactor = ((1 + growthRate) ^ designYears - 1) / growthRatecumulativeVehicles = dailyTraffic × 365 × directionalFactor × laneFactor × growthSeriesFactorequivalentStandardAxles = cumulativeVehicles × suppliedEquivalencyFactorNo layer or structure is calculated without a validated pack.
Testing, origin and availability remain to be examined.
Traffic, soil, water, climate and maintenance require a complete study.
No protected table is reproduced and no legacy guide is treated as universal truth.
Road reference identified for documentary review; not activated as a Cameroonian or universal method.
View official sourceaccess-required · restrictedNo. It produces neither pavement structure nor thickness.
The supplied average number of vehicles per day for a class.
Traffic projected over the period with displayed distribution factors and growth.
It sets the number of years over which traffic is accumulated.
The assumed yearly traffic evolution, entered explicitly.
The share of traffic assigned to the studied direction.
The share of directional traffic assigned to the studied lane.
A coefficient from a defined method used to convert a class into reference axles.
No. The factor and its source must be supplied.
A soil bearing indicator to document through testing and an appropriate study.
Water affects soil and material behaviour; the tool collects this information without inferring a structure.
No, that function remains disabled without an official validated pack.
Factors, classes, materials and rules depend on a reference, version and jurisdiction.
Voluntarily attach the report, counts and available documents to a civil engineering request.
The report organises counts and gaps before selecting an appropriate road method.